News

TECHNICAL ASSISTANCE: CONSTRUCTION OF PLATFORM OF THE MURCIA-ALMERÍA HIGH SPEED "MEDITERRANEAN CORRIDOR". SECTION: LOS AREJOS-NÍJAR

29 May 2019

The purpose of the works, included in the Murcia-Almería High-Speed "Mediterranean Corridor", is the execution of a double-track high-speed platform in a length of 9.2 km and the rest in a single track, with a total length of 17,82 km, defined for a mixed traffic operation with functional and design parameters between 250 and 300km/h for passenger traffic and a minimum speed of 80km/h for goods traffic.

The route crosses the municipalities of Sorbas, Lucainena de las Torres and Níjar.

a.t_murcia-almeria_los_arejos-nijar.jpg

Some of our projects

The tourist impact of certain events held in Andalusia Consultrans has commissioned Turismo Andaluz...
Access port of Valencia. Structural Planning The Project Design is aimed to reorganize...
Strategic Plan R&D in ICT Ecuador The study aim is assessment of technological...
National Transport Plan for Algeria The project consists of a study on National...

Our areas of activity :


Transport


International


Research and Development


Social Research


Consultoria tecnologica


Civil Engineering